Evidence for the decision.

Find published research and synthetic demonstrations, with planned and developing topics clearly separated.

9 published public-data studies4 synthetic demonstrations51 planned or developing topics

Construction and infrastructure

0 published studies · 3 planned or developing topics

Planned topics & work in progress

No findings are published for this selection yet. These topics are separate from completed findings. Each status reflects the work actually performed.

S55 / Construction and infrastructure

Permit-process duration and project planning risk

A construction planning team needs realistic administrative lead times before committing downstream resources. Estimate the distribution of time from a documented filing milestone to a documented permit milestone and identify where uncertainty is greatest.

Planned topic

Proposed design & source

Survival/AFT models; multistate processes; hierarchical pooling

Choose a consistent DOB system and application cohort with reliable milestone dates. Separate application, job and permit identifiers, amendments and withdrawals. Fit hierarchical accelerated-failure-time or survival models using information known at the starting milestone; retain unresolved applications as censored where follow-up is observable.

Evaluation: Hold out later filing cohorts and compare with category-level historical medians. Report horizon-specific calibration, censoring-adjusted error and interval coverage. Audit missing dates, system migrations and whether the apparent endpoint is original issuance or a later revision.

Boundary: Permit dates do not identify construction completion, total project cost or the causal effect of an expediting service. If milestone history is unavailable, narrow the question to the reliably observed administrative interval.

NYC DOB applications and permits ↗

S56 / Construction and infrastructure

Construction-market outlook for commercial capacity planning

A contractor or construction-services business needs to anticipate shifts in demand across market segments. Test whether pooled sector forecasts improve planning over simple extrapolation of the latest spending growth.

Planned topic

Proposed design & source

Dynamic factors; coherent sector forecasts; nominal/real decomposition

Build consistent monthly Census construction-spending series by supported category. Distinguish seasonally adjusted annual rates from unadjusted monthly values and avoid summing incompatible units. Compare local trends, dynamic-factor models and coherent sector forecasts. Add appropriate public price indices only as an explicit real-spending extension.

Evaluation: Use rolling multi-month horizons with seasonal/trend baselines. Report scaled error, turning-point performance, interval coverage and revision sensitivity. Translate forecasts into a hypothetical staffing/capacity scenario only after specifying a business's market share and productivity assumptions.

Boundary: Aggregate spending cannot measure individual project overruns, backlog or contractor profitability. Forecasting a sector does not establish the demand a particular firm will win.

Construction Spending / Value Put in Place ↗

S57 / Construction and infrastructure

Turning severe-injury narratives into a prevention taxonomy

A construction safety team needs a consistent view of recurring hazard mechanisms across incident reports. Test whether structured text extraction can organize reported incidents accurately enough to support expert review and training priorities.

Planned topic

Proposed design & source

Structured NLP; measurement validation; selective classification

Filter the OSHA records to the documented construction industry codes and eligible jurisdiction/time coverage. Build a prespecified mechanism/activity taxonomy. Compare keyword and TF-IDF baselines with a structured language-model classifier; retain supporting text spans and an abstention option for ambiguous cases.

Evaluation: Create a de-identified, independently adjudicated evaluation sample with clear labeling rules; report agreement, class-specific precision/recall and error-versus-review-volume curves. Use later periods for drift checks. Without expert labels, treat the model as an unvalidated organizing aid.

Boundary: Coverage excludes important jurisdictions and the severe-injury report system is not a complete fatality census. Counts lack matching worker-hour denominators; do not rank employers by safety or claim a prevention intervention reduced injuries.

OSHA Severe Injury Reports — construction subset ↗

The 60-topic program spans 20 industries, with 9 studies published. Synthetic demonstrations are counted separately. Unpublished topics have no public case-study route.