S55 / Construction and infrastructure
Permit-process duration and project planning risk
A construction planning team needs realistic administrative lead times before committing downstream resources. Estimate the distribution of time from a documented filing milestone to a documented permit milestone and identify where uncertainty is greatest.
Planned topic
Proposed design & source
Survival/AFT models; multistate processes; hierarchical pooling
Choose a consistent DOB system and application cohort with reliable milestone dates. Separate application, job and permit identifiers, amendments and withdrawals. Fit hierarchical accelerated-failure-time or survival models using information known at the starting milestone; retain unresolved applications as censored where follow-up is observable.
Evaluation: Hold out later filing cohorts and compare with category-level historical medians. Report horizon-specific calibration, censoring-adjusted error and interval coverage. Audit missing dates, system migrations and whether the apparent endpoint is original issuance or a later revision.
Boundary: Permit dates do not identify construction completion, total project cost or the causal effect of an expediting service. If milestone history is unavailable, narrow the question to the reliably observed administrative interval.